Iowa DOT: “Tell us what you think about a proposed bridge replacement on U.S. 30 over Boyer River in Crawford County”

News

January 9th, 2025 by Ric Hanson

AMES, Iowa – Jan. 8, 2025 – The Iowa Department of Transportation (DOT) as asking for your input, with regard to a planned bridge replacement on U.S. 30 over Boyer River in Crawford County (Event # 6406).  Construction is scheduled to begin in 2028. Traffic will be detoured during construction. The proposed detour would follow U.S. 59 to County Road E59 into Dow City. Access to properties will be maintained at all times.

SHARE YOUR FEEDBACK

PROJECT PLANS

For questions about the project or for free translation services, contact:
Sarah Tracy, P.E. Transportation Planner
Iowa DOT District 3 Office, 6409 Gordon Drive, Sioux City, Iowa 51106,
Phone: 712-276-1451 or Email: sarah.tracy@iowadot.us