United Group Insurance

Rough winter leads DOT to allocate money for pavement pothole fixes

News

March 15th, 2023 by Ric Hanson

(Radio Iowa) – If you’ve hit some rough stretches on state highways, you are not alone. The Iowa Transportation Commission has approved amending its budget to spend 15 million dollars on weather repairs. The D-O-T’s Stuart Anderson says there’s been an above normal number of freeze-thaw cycles this winter that are causing issues. “We are seeing some significant impacts on some pavements,” he says. Anderson says they checked with maintenance districts across the state and believe this money will help take care of some of the issues. “It certainly won’t address all the damage we’re seeing — but it’ll get the worst of it,” Anderson says. “The last time, we had something like this was about four years ago, March 2019, we came out of a pretty unique winter season and saw the same kind of damage.”

U-S Highway 218 (IA DOT Photo)

Anderson says the Transportation Commission took the same action and spent 12 million in winter repairs in 2019. He says there are issues across the state and the money will be spread evenly among the maintenance districts. He says each district will get two-and-a-half million dollars to do the repairs. The D-O-T’s chief engineer, Mitch Dillavou says the conditions have been the worst you can get for pavement. “It’s the uniqueness of this winter where you get those fluctuations in temperatures, plus we’ve had a lot of moisture,” Dillavou says. He says his perfect winter conditions for pavement are when the temperature drops and stays the same and there’s not a lot of melting water or rain that gets into pavement cracks. Dillavou says the older pavement has more problems.

“Our newer roads have a good drainable base and better infrastructure. So, it’s our older pavements that you’ve heard just talked about quite a bit,” he says. “it gets down in there, and then it freezes, and then it just starts cracking. and things move.” Anderson says the 15 million dollars will be moved out of the next fiscal year budget to allow them to handle the repairs as soon as they can.